School in Nova Gorica*

* School in the west of Slovenia, close to the Italien border

5.200 m2

three upper floors + ground floor + basement 

89.658 €

annual cost savings 

439.324 €

increased cost due to investment in SUNOMAX2020 technology 

4,9 YEARS

for investment payback 

6,6 kWh/m2

energy consumption per year 

4.593 €

energy costs per year 

image

English version

German version

Case
Results________

 WINTER 2018/2019


COSTS EXPECTED

For heating per year
Expected heating costs for the original project (using district heating system)
= 58.252 €

COST SAVINGS

Actual costs for the SUNOMAX2020 system
(28% heat pump operation, 20% operation of underground thermal energy storage, 52% operation of solar panels)
= 1.347 €

Savings 56.905 €

For domestic hot water per year
Expected costs for domestic hot water for the original project (using district heating system + electric heater)
= 2.040 €

Actual costs for the SUNOMAX2020 system
(84% operation of solar panels + 16% heat pump operation)
= 150 €

Savings 1.890 €

Case
Results________

 SUMMER 2019


COSTS EXPECTED

For cooling per year
Expected costs for cooling for the original project (434 kW chiller)
= 27.440 €

COST SAVINGS

Actual costs for the SUNOMAX2020 system
(groundwater free cooling)
= 1.037 €

Savings 26.403 €

For ventilation per year
Expected costs for ventilation for the original project (ventilation systems with 60% waste heat recovery)
= 6.520 €

Actual costs for the SUNOMAX2020 system
(using ventilation systems with 90% waste heat recovery and retrofitted CO2 sensors)
= 2.060 €

Savings 4.460 €

Energy
Consumption________


  • ventilation
  • heating
  • cooling
  • hot water
  • pumps
  • control systems

6,6 kWh/m2 per year

original project ... 231,218 kg CO2 per year

SUNOMAX2020 ... 14,717 kg CO2 per year

Savings 215,501 kg CO2 per year